The process begins with mobilization. A dredge, support equipment, pumps and pipeline and dispatched to the job site. Job site setup takes about 3 days; this involves reconstruction meetings and training for crew members, the installation a dredge, 2km's of pipeline, support equipment and pumps. Geotubes or Beltpresses are used to separate liquids from solids.